Here’s our latest Phone Mast Case Study. During these last winter months, our Northern office has been working in partnership with an experienced Telecoms Company […]
St Albans Abbey Case Study
Our job was to provide accurate floor plan drawings of the layout of the tower as well as section drawings which would show the relationship between the two separate bell frame structures. | Midland Survey
Level Six Service Avoidance Survey
MSL Surveys Ltd were asked to carry out a TSA (The Survey Association) level six Utility survey on a very large college site in Oxfordshire.
3D Handheld Scanning of Historic Buildings
For institutions of immense historical importance, regular upkeep is vital to preserve the structural integrity of the buildings.